Home/Case studies/Moving a 700-page website from Tilda to our own server
  • SEO and technical
  • ADWAI (our own website)

Moving a 700-page website from Tilda to our own server

We moved more than 700 pages and 650 blog articles from a site builder to a private server, kept every address, replaced forms and payment with our own, and made automatic content publishing possible.

Moving a 700-page website from Tilda to our own server
702addresses in the sitemap after the move
650+blog articles moved and working without the old platform
5 mininterval of automatic site checks
1own server instead of a platform subscription

The task

Leave the site builder without losing page addresses, the blog, enquiries or search positions, and gain the freedom a builder does not give.

What we did

  • Exported the whole site (457 pages, 425 of them in the sitemap). This is the base, but the export does not include the blog feed or forms.
  • Deployed a copy on our own server on a separate address closed to search engines. Every address from the sitemap opened and the home page text matched the live one.
  • Rebuilt the blog without the platform: 384 posts exported from the feed, plus 269 older articles in an archive section, with search, categories and load-more.
  • Replaced the builder's forms with our own system (every enquiry arrives in Telegram at once) and connected our own payments with instalments.
  • Set permanent 301 redirects for changed addresses, prepared robots.txt and the sitemap, closed service pages to indexing, and only then switched the live address.
  • Turned on monitoring and daily backups from day one.

Before and after

BeforeAfter
Publishing articles and newsBy hand in the editorAutomatically: material arrives from agents
BlogPlatform feedOur own blog: search, categories, 650+ articles, RSS
New sectionsLimited to the builder's blocksA seller reference with thousands of pages and a profit calculator
EnquiriesOn the platform's serversOur own system, instant Telegram notification
Site editsHours in the editorWe give a task to an agent and it makes the change
MonitoringOn the platform's sideA check every 5 minutes, daily backups

Results

BeforeAfter
Platform or server, per year$200$240
Time for site edits, per month3 working days (20-25 hours)Minutes: we set a task for the agent

Direct costs did not fall: the real gain is in hours of work and in a site that now grows by itself.

Takeaways

  • Keep page addresses. For pages that change address, set permanent 301 redirects.
  • Move the whole blog and make sure it works without calls to the old platform. The export does not include the blog feed, so posts must be exported separately.
  • Reconnect forms and payment: they are tied to the builder's infrastructure and will not move on their own.
  • Do not switch the old site off until the new one is verified: test on a closed copy first, then switch the address.
  • Update robots.txt, the sitemap and analytics before launch.
  • No move is risk-free. We promise careful work, not specific positions.

Amounts are shown in US dollars, converted at a fixed rate.

Want results like this?

Request a free consultation. Tell us about your project and we will say honestly what we can do.

  • Free, no obligation
  • Reply within one business day
  • Straight answer, even if the answer is "you do not need us"

Request a free consultation

Tell us about your project. We reply by e-mail within one business day.

By sending this form you agree to our privacy policy. Prefer e-mail? Write to team@adwai.digital.